This object is in archive! 

Labour Charges

Steve O. shared this idea 9 years ago
Under Consideration

IO offers two options for labour as far as i can tell - with or without setup time included. I would like to see a third option which includes - driving time to event, setup/teardown time, and operational time. If possible all as separate options that could be added to the quote page as some jobs require attendants, some don't etc.


any suggestions gladly received.


Thanks

Best Answer
photo

"Include Setup" does actually include the travel time on the contract tab of the lead. It's up to your settings whether or not to automatically calculate the travel time on a lead when it's created.

It essentially means "calculate a staff charge for the entire length that the equipment is out." But that's too long to put in a dropdown box.

Whether or not to include staffing fees is always determined by the delivery method. See the "staff" option in Settings -> Delivery Methods.

Comments (1)

photo
1

"Include Setup" does actually include the travel time on the contract tab of the lead. It's up to your settings whether or not to automatically calculate the travel time on a lead when it's created.

It essentially means "calculate a staff charge for the entire length that the equipment is out." But that's too long to put in a dropdown box.

Whether or not to include staffing fees is always determined by the delivery method. See the "staff" option in Settings -> Delivery Methods.

Leave a Comment
 
Attach a file